Description
APPLICATION FOR THE POST OF QUANTITY SURVEYOR
Dear,
Seeking a career as a Quantity Surveyor where I can use my 5 years of expertise working in Qatar to guarantee the reliability of the MEP, Infra Roads and Highways, ITS and Traffic Signal from April 2019 to March 2024.
WORKING EXPERIENCE
§ Lighting, Power, CCTV, Fire Alarm, Public Address (PAVA), Access Control System (ACS), Nurse Call System (NCS), Master Clock, Emergency Light, BMS, Audio Visual System and Structured Cabling System (Aug 2023 to Jun 2024 – Al-Muftah Interior for Contracting)
§ Network-ITS (LAN & WAN Fibre Optic 96C, Fibre Optic 24C, 12C Drop SMFO, Cat6A, Cat6 and RS485)
§ Traffic Signal, Road Sign-DMS, SDMS, LCS, WIM, OVDS, RWIS, LPR, ANPR, RVD-Radar, PTZ Camera, AID Camera, B.Camera, Red Light Violence Camera and CCTV (Outdoor and Indoor).
§ Power Cable (Electrical)-ITS and Street Lights (Substation, HV, MV, LV, Service Cabinet, Feeder Pillar & Power Cable Calculations for Existing & Proposal)
(May 2019 to Mar 2023 - KTC, QTCG & EMI-JV)
§ Express Highway, Service Roads, Bridges, Underpass, Manholes, Interlock, Kerbstone, Road Marking, DC & IC chamber, Duct Laying and Dry Utilities. (RLVC Camera)
(April 2019 to June 2021 - QTCG & KTC)
§ Car Park Shades, Car Parking Management System, Wheel Stopper, Speed Humps, Lighting Bollard and Protection Bollard.
(April 2019 to Dec 2019 – KTC)
And all the projects indicated under Ashghal (PWA), MOI, HMC and Kahramaa.
ROLES & RESPONSIBILITIES
Quantity Surveyor
§ Take off quantities from either drawings or the model.
§ Design or Drafting experience with AutoCAD.
§ Knowledge about Pre and Post contract.
§ Help develop quantity tracking items that will be identifiable construction
§ Sub-contractor payment management and analysis.
§ Lead in the preparation of variation orders and supporting documents.
§ Preparing the materials, equipment and labour costs. (Rate Analysis)
§ Reading skill of drawings model (IFC or Reference design, Preliminary Design, Detailed design, Shop drawing and Schematic diagrams)
§ Preparing the material submittal, method statement and WIR or RFI
§ Measure value of work done at the site.
§ Preparing interim payment application (IPA) after completion of inspection.
§ Reviewing monthly Interim Payment Certificate and preparation of Final Account.
I do hereby certify that the above-mentioned particulars are true and accurate to the best of my knowledge.
Yours faithfully,
Mohamed Nusri