Ø  8 (eight) years comprehensive work experience in Gulf Construction field for Mechanical Engineering

§  Coordination with the following project Specification, IFC, shop drawings, as-built drawings, material submittals, approved materials, materials inspection, method statements, installation on site, BOQ, RFI, and commissioning & testing, etc.

§  Supervision in Installation of Fire Protection System, sprinkler, fire hose, stand pipe, clean agent/FM200 and testing and commissioning.

§  Supervision in Installation Ducts, FAHU ,AHU, CRAC, PEU, FCU, Chilled Water Pipe, copper pipe welding, HDPE pipe, PVC pipe  and hydro testing and commissioning.

§  Supervision in installation of plumbing, irrigation, waste water treatment and drainage System testing and commissioning.

§  Prepare installation materials take–off for site execution.

§  Monitor material delivery and coordinate for material delivery on-site inspection.

§  Supervise daily manpower activities

§  Conduct work training and safety training

§  Prepare progress daily and weekly reports and project key performance index.

§  Report to the immediate superior/project manager in daily basis.

§  Supervision and monitoring material, power tools and mechanical equipment.

§  Supervision on MEP operation and facilities for fire protection system, HVAC system and plumbing system.

[email protected]