Urgent requirement
get rid of the roundabouts (meant for lower density of traffic). Signals at the roundabouts are just chaotic.
Plan for flyovers - one mainly at the Ramada Junction.
Increase the width of Salwa Road (number of lanes to 4 atleast). Same with road leading to Industrial area (Waqod petrol stations).Have a parallel road to this raod which might go through the mowasalat office. (might be called the F rind Road).
Most importantly have and ensure Ashghal start and finish projects on time.I have never seen such an inefficient Public Works Authority (sorry to say that)- if at all they blame the contractors put in a penalty clause in the contracts.Ensure accountability on all projects.
All the best - cause its easy to say and more difficult to implement.
Urgent requirement
get rid of the roundabouts (meant for lower density of traffic). Signals at the roundabouts are just chaotic.
Plan for flyovers - one mainly at the Ramada Junction.
Increase the width of Salwa Road (number of lanes to 4 atleast). Same with road leading to Industrial area (Waqod petrol stations).Have a parallel road to this raod which might go through the mowasalat office. (might be called the F rind Road).
Most importantly have and ensure Ashghal start and finish projects on time.I have never seen such an inefficient Public Works Authority (sorry to say that)- if at all they blame the contractors put in a penalty clause in the contracts.Ensure accountability on all projects.
All the best - cause its easy to say and more difficult to implement.